No matter you come to us with fully-developed concept or just a basic thought, our creative team is capable of providing the best solution and visualization tools to transform them into efficient, productive retail merchandising, by focusing on your needs, product functionality and fashion trends.
1. Design Change and Modification
2. New Design and Development
3. 3D Rendering and 3D Modeling
4. Structural FEA and Evaluation
5. 2D Engineering Drawings
Lead Time: 5 to 7 days with no tooling
Lead Time: 10 to 14 days with tooling
Sample Testing for Safety, Ergonomics, Capability, Durability
Lead Time
POP/POS: 20 to 30 days
The whole store: 35 to 45 days
Production Management
1. Flexible Production Volume
2. Expediting Production
3. Small Lot Release
4. Assembling & Testing
5. Kitting & Palletizing